Critz Lane Widening

The entire length of Critz Lane, approximately 2 miles, which runs past Fields of Canterbury and Bridgemore Village subdivisions between Columbia Pike and Lewisburg Pike, will be widened to accommodate the increased traffic and provide a safer roadway. The large hill just east of Clayton Arnold Rd intersection will be lowered and roundabouts at the intersections at Clayton Arnold and Pantall Roads are to be installed with the referenced design.

The Project has been split into 3 Sections: The first section of the project will be centered around the Critz Lane / Clayton Arnold intersection and along the road in front of the Canterbury development. Sections 2 and 3 will encompass the west and east ends of Critz Lane respectively.  

Critz Lane Vicinity Map - Click the map for PDF

TownwideVicinity_CritzLn

Utility Relocation: With the property Acquisition phase complete, this phase of the project is currently underway.  In March 2021, the Board of Mayor and Alderman, at their regular monthly meeting, voted to award the contract for wastewater utility line relocation to Hughes Excavating.  (Link to Meeting Video / Meeting Minutes)  Other utilities such as gas, electric & water are working concurrently to move their lines as well.  

Utility Line Relocation / Project Overview - Click for PDF

Overview - CRITZ LANE Utility Relocation CONSTRUCTION DRAWINGS

While Barge Design Solutions LLC have created overall plans for the entire width of the Critz Ln project, Ragan/Smith Engineering LLC is the company currently designing and installing Section 1 of the project.  

Construction Plans

Bid documents from Ragan/Smith were released in 2020 with construction plans available here.   

Critz/Clayton Arnold Roundabout - PDF

Roundabout Critz Lane Construction Plans 2020.07.13_BID SET (1)

Intersection at Avenue Downs/Lionscrest/Critz - PDF

Pages from Critz Lane Construction Plans 2020.07.13_BID SET

Construction Detour: While a section of Critz Lane is closed, a detour route will be setup through the Avenue Downs property at the south-west corner of the Critz Ln / Clayton Arnold Rd intersection (pictured below).  This connection will allow traffic to flow in and out of Canterbury from Lioncrest Lane onto Clayton Arnold Road.  The dates of closure will be known once Utility Relocation is completed.

Construction Detour through Avenue Downs - PDF

Pages from Critz Lane Construction Plans 2020.07.13_BID SET